A walk or patio requires a 4-inch layer of compacted paver base, while a driveway needs a 12-inch layer. An additional 1- to 1 1/2-inch layer of sand, plus the height of the pavers will determine the final depth of the excavation. … Smooth and compact the soil with a hand or plate compactor before adding the paver base.